Explore a literature survey of the most important Extreme Programming (XP) process models. This review covers various approaches, from simulation models and Bayesian networks to Net Present Value (NPV) analysis, used to predict project effort, productivity, and quality.Explore a literature survey of the most important Extreme Programming (XP) process models. This review covers various approaches, from simulation models and Bayesian networks to Net Present Value (NPV) analysis, used to predict project effort, productivity, and quality.

Predicting Software Development with XP: A Look at Existing Models

2025/08/26 10:00
3분 읽기
이 콘텐츠에 대한 의견이나 우려 사항이 있으시면 [email protected]으로 연락주시기 바랍니다

Abstract and 1. Introduction

  1. Background and 2.1. Related Work

    2.2. The Impact of XP Practices on Software Productivity and Quality

    2.3. Bayesian Network Modelling

  2. Model Design

    3.1. Model Overview

    3.2. Team Velocity Model

    3.3. Defected Story Points Model

  3. Model Validation

    4.1. Experiments Setup

    4.2. Results and Discussion

  4. Conclusions and References

2. BACKGROUND

In the next section, a literature survey of related work will be provided. The survey covers a number of the most important XP process models existing in the literature. Then, the Impact of XP Practices on Software Productivity and Quality is illustrated in the following section. Finally, an overview of the Bayesian Network will be provided in the last section.

2.1. Related Work

Although the widespread usage of XP in both academic and industry, only few attempts for modelling XP exists. In this section, we will provide a survey of the most important XP Process models.

\ In [2], a simulation model was developed to analyse the effects of almost all XP practices on the software development effort. The developed model was applied for a typical XP project and the effects of all the individual practices were calculated. The results showed a reduction in software development cost as increasing the usage levels of all XP practices.

\ In [3], the authors built a software effort prediction model for XP based on Bayesian networks. The proposed model can learn from project data in order to make quantitative effort predictions and risk assessments. The model has been validated by applying to a real industrial project. Collecting data from the early part of the project enabled the model to update its parameters and improve its predictions. The model could successfully achieve extremely accurate predictions about the level of functionality delivered over time.

\ In [4], the authors introduced an XP process model to evaluate the effectiveness of XP key practices (Pair Programming, Test-First Programming), and to investigate how the practices influence the evolution of a certain project. To achieve this, software process simulation has been chosen. A process model has been developed and a simulation executive has been implemented to enable simulation of XP software development activities to simulate how the modeled project entities evolve as a result.

\ Williams and Erdogmus [5] developed a Net Present Value (NPV) model of Pair Programming (PP). The model combines the productivity rates, code production rates, defect insertion rates, and defect removal rates. The authors conclude that PP is a “viable alternative to individual programming.”

\ In [6], the authors model, simulate and analyze the pair programming and pair switching practices. The model explores many variables affecting pair programming efficiency. The results showed that XP efficiency increases with both psychological compatibility and pair adaptation speed between the members of the pair. In addition, the XP process appears to have an advantage over the traditional approach when pair switches are not too frequent.

\

:::info Authors:

(1) Mohamed Abouelelam, Software System Engineering, University of Regina, Regina, Canada;

(2) Luigi Benedicenti, Software System Engineering, University of Regina, Regina, Canada.

:::


:::info This paper is available on arxiv under CC BY-NC-ND 4.0 DEED license.

:::

\

시장 기회
Xphere 로고
Xphere 가격(XP)
$0.055838
$0.055838$0.055838
+5.93%
USD
Xphere (XP) 실시간 가격 차트
면책 조항: 본 사이트에 재게시된 글들은 공개 플랫폼에서 가져온 것으로 정보 제공 목적으로만 제공됩니다. 이는 반드시 MEXC의 견해를 반영하는 것은 아닙니다. 모든 권리는 원저자에게 있습니다. 제3자의 권리를 침해하는 콘텐츠가 있다고 판단될 경우, [email protected]으로 연락하여 삭제 요청을 해주시기 바랍니다. MEXC는 콘텐츠의 정확성, 완전성 또는 시의적절성에 대해 어떠한 보증도 하지 않으며, 제공된 정보에 기반하여 취해진 어떠한 조치에 대해서도 책임을 지지 않습니다. 본 콘텐츠는 금융, 법률 또는 기타 전문적인 조언을 구성하지 않으며, MEXC의 추천이나 보증으로 간주되어서는 안 됩니다.

No Chart Skills? Still Profit

No Chart Skills? Still ProfitNo Chart Skills? Still Profit

Copy top traders in 3s with auto trading!